BackgroundCheck.run
Search For

Manoj T Abraham, 507504 Wright Dr, Frisco, TX 75035

Manoj Abraham Phones & Addresses

7504 Wright Dr, Frisco, TX 75035    314-4883213   

Fenton, MO   

Cedar Rapids, IA   

2562 Bellecote Ave, Saint Louis, MO 63114    314-4231115   

664 Geoffry Ln, Saint Louis, MO 63132    314-5670940   

Fayette, MO   

Valley Park, MO   

1628 Ivy Chase Ln, Fenton, MO 63026    636-4481879   

Work

Position: Food Preparation and Serving Related Occupations

Mentions for Manoj T Abraham

Career records & work history

Medicine Doctors

Manoj T. Abraham

Specialties:
Otolaryngology, Plastic Surgery, Facial Plastic Surgery
Work:
Hudson Dermatology
969 Main St STE D, Fishkill, NY 12524
845-8967730 (phone) 845-8967758 (fax)
Ear Nose Throat Faculty PracEar Nose & Throat Faculty Practice
1055 Saw Ml Riv Rd STE 101, Ardsley, NY 10502
914-6937636 (phone) 914-6935994 (fax)
Site
Facial Plastic Reconstructive & Laser Surgery
82 N Water St, Poughkeepsie, NY 12601
845-4548025 (phone) 845-4548026 (fax)
Education:
Medical School
Cornell University Weill Medical College
Graduated: 1997
Procedures:
Rhinoplasty, Sinus Surgery
Conditions:
Allergic Rhinitis, Deviated Nasal Septum, Acute Sinusitis, Benign Paroxysmal Positional Vertigo, Chronic Sinusitis, Obstructive Sleep Apnea, Otitis Media
Languages:
English, Spanish
Description:
Dr. Manoj T. Abraham is double board certified in Facial Plastic & Reconstructive Surgery. He has been practicing medicine for 18 years. Dr. Abraham graduated from the Cornell University Weill Medical College in 1997. He has offices in Poughkeepsie, Westchester and NYC. Dr. Abraham has an accredited surgical suite in his Poughkeepsie office, and is affiliated with MidHudson Hospital and

Manoj Abraham resumes & CV records

Resumes

Manoj Abraham Photo 31

Manoj Abraham

Manoj Abraham Photo 32

Manoj Abraham

Manoj Abraham Photo 33

Technical Support Analyst At Dell Perot Systems

Location:
Dallas/Fort Worth Area
Industry:
Information Technology and Services

Publications & IP owners

Us Patents

Generating A Supply Chain Plan

US Patent:
7672862, Mar 2, 2010
Filed:
Dec 4, 2001
Appl. No.:
10/004725
Inventors:
Manoj Abraham - Dallas TX, US
David Michael - Dallas TX, US
Mehdi Sheikhzadeh - Irving TX, US
Assignee:
i2 Technologies US, Inc. - Dallas TX
International Classification:
G06F 9/46
US Classification:
705 8
Abstract:
Generating a supply chain plan includes accessing data describing a supply chain network having buffers. Each buffer is operable to store items and is associated with a corresponding time variable. The supply chain network is constrained by a constraint. A linear programming problem is generated for the supply chain network. The linear programming problem is approximated by discretizing the time variables of the buffers to yield discretized time variables and by relaxing the constraint to yield a relaxed constraint. An optimized supply chain plan is calculated for the approximated linear programming problem. The optimized supply chain plan describes a quantity of items at each buffer for at least one time value of the corresponding time variable. The optimized supply chain plan is adjusted to satisfy the constraint.

Generating An Order Plan For A Supply Chain Network

US Patent:
7895090, Feb 22, 2011
Filed:
Oct 19, 2007
Appl. No.:
11/875159
Inventors:
Manoj Abraham - Dallas TX, US
Assignee:
i2 Technologies US, Inc. - Dallas TX
International Classification:
G06Q 10/00
US Classification:
705 28
Abstract:
Generating an order plan is disclosed. Data describing priority levels including at least one item request is accessed. Data describing a supply chain network including network components that supply one or more items to satisfy an item request is accessed. For each priority level, and for each item request of a priority level, an order for an item request of a current priority level is planned according to recorded unplannable network components that are unable to satisfy an item request, and the unplannable network components for the current priority level are determined. For each priority level, the unplannable network components are validated for the current priority level, and the validated unplannable network components for the current priority level are recorded. An order plan including the orders planned for the item requests at each priority level is provided.

Generating An Order Plan For A Supply Chain Network

US Patent:
8244601, Aug 14, 2012
Filed:
Oct 10, 2006
Appl. No.:
11/545308
Inventors:
Manoj Abraham - Dallas TX, US
Assignee:
JDA Software Group, Inc. - Scottsdale AZ
International Classification:
G06Q 10/001
US Classification:
705 28
Abstract:
Generating an order plan is disclosed. Data describing priority levels including at least one item request is accessed. Data describing a supply chain network () including network components () that supply one or more items to satisfy an item request is accessed. For each priority level, and for each item request of a priority level, an order for an item request of a current priority level is planned according to recorded unplannable network components () that are unable to satisfy an item request, and the unplannable network components () for the current priority level are determined. For each priority level, the unplannable network components () are validated for the current priority level, and the validated unplannable network components () for the current priority level are recorded. An order plan including the orders planned for the item requests at each priority level is provided.

Generating An Order Plan For A Supply Chain Network

US Patent:
7177827, Feb 13, 2007
Filed:
Aug 8, 2001
Appl. No.:
09/925149
Inventors:
Manoj Abraham - Dallas TX, US
Assignee:
i2 Technologies US, Inc. - Dallas TX
International Classification:
G06Q 30/00
US Classification:
705 28, 705 1
Abstract:
Generating an order plan is disclosed. Data describing priority levels including at least one item request is accessed. Data describing a supply chain network () including network components () that supply one or more items to satisfy an item request is accessed. For each priority level, and for each item request of a priority level, an order for an item request of a current priority level is planned according to recorded unplannable network components () that are unable to satisfy an item request, and the unplannable network components () for the current priority level are determined. For each priority level, the unplannable network components () are validated for the current priority level, and the validated unplannable network components () for the current priority level are recorded. An order plan including the orders planned for the item requests at each priority level is provided.

NOTICE: You may not use BackgroundCheck or the information it provides to make decisions about employment, credit, housing or any other purpose that would require Fair Credit Reporting Act (FCRA) compliance. BackgroundCheck is not a Consumer Reporting Agency (CRA) as defined by the FCRA and does not provide consumer reports.